FREE CONSTRUCTION WORK ORDER TEMPLATE

Tie each task to its project, permit, and inspection milestone, so authorized work has a paper trail the GC will accept.

Your business
Customer
Job details
Project & authorization details Construction
Tasks & materials

Start typing — common Construction tasks and parts will suggest.

DescriptionQty
Work order detailsWO-1001
Notes

Business name

WORK ORDER

No. WO-1001

OpenStandard
CustomerCustomer name
Service addressService address
ScheduleSchedule
Technician / crewTechnician / crew
Job description

Add a task or part to see it here.

DescriptionQty
Add a task or part to see it here.
Customer sign-off
Signature
Name
Date

Workforce management for shift-based teams

Time Tracking • Shift Scheduling • Time Off Management

Free 14-day trial · No credit card required

What a construction work order has to authorize

A construction work order is the paper trail for authorized work. Framing one phase, correcting an inspection item, and pricing extra scope each leave behind different facts the job needs later — the project and phase, the drawing or spec it ties to, the permit, the inspection milestone, and the crew or sub that did it. A bare description box drops all of that, and on a contract job the missing detail is exactly what a GC, an inspector, or a payment dispute hinges on.

Everything begins with the authorization: project and phase, the drawing or spec it ties to, the change order and permit numbers, the inspection milestone, and the sub and crew size. Pick tasks and materials from the construction suggestions as you go, and the order takes shape in the preview. Print it for the field or export a PDF — nothing leaves your browser, and there's no account to set up.

What to include in a construction work order

On a contract job, the work order is the authorization trail — it should leave no doubt about what was approved. Most include:

  • Project and phase with the drawing or spec reference, so the work ties to the documents it came from.
  • The authorization — the change order number when the work adds scope, so extra work is never a verbal "just do it."
  • Permit and inspection milestone — the permit number and which inspection (footing, framing, rough-in, final) the work is for.
  • Crew and subcontractor — who is on the job, the crew size, and any sub doing the work.
  • Tasks and materials, line by line — framing, concrete, drywall, plus lumber, fasteners, and equipment time as T&M or allowance.
  • Sign-off and photos — GC or customer approval, with before-and-after photos kept alongside the order.

How to create a construction work order

Fill in the form and the preview updates as you type. To authorize a piece of work:

  1. Open the project section and enter the project and phase, drawing or spec reference, and permit number.
  2. Record the authorization — the change order number and inspection milestone where they apply.
  3. Add the subcontractor and crew size, plus the customer and site address.
  4. List the tasks and materials — framing, concrete, drywall, lumber, equipment time — picking from the construction suggestions as you type.
  5. Download the PDF or print it for the crew, and keep before-and-after photos with the order.

A note on site safety

A construction work order often doubles as a safety record. Falls are the leading cause of death in construction, and OSHA requires fall protection above set heights — so on orders that cover roofs, scaffolds, or leading edges, a quick safety line shows the protection was planned, not improvised.

OSHA — Fall Protection

Work order generator FAQ

What should a construction work order include?

Beyond the customer and job description, a construction work order should capture the project and phase, the drawing or spec reference, any change order and permit numbers, the inspection milestone, and the subcontractor and crew size. This template includes all of those as dedicated fields so they print on the PDF.

What's the difference between a work order and a change order?

A work order documents and authorizes work, labor, and materials. A change order modifies the original contract scope or price, and its terms vary by contract and state. This template has a change order number field so added scope is tied back to its authorization — but the change order agreement itself lives in your contract.

What is an extra work order (EWO) or stop work order?

Those are two more construction documents people mix up with a standard work order. An extra work order (EWO) authorizes and prices work beyond the original contract — close to a change order, and often what triggers one. A stop work order does the opposite: it halts work, usually from an inspector or the GC, until an issue is resolved. This template builds the everyday work order that assigns and documents the job; record an EWO or stop-work reference in the notes so the whole trail stays together.

Does it track permits and inspections?

Yes. There are dedicated permit number and inspection milestone fields (footing, foundation, framing, rough-in, insulation, final). Recording them on the work order keeps the job tied to its approval trail. Requirements vary by jurisdiction; confirm with your local authority.

Can I add prices for labor and materials?

Yes. Turn on Add pricing and each task or material gets a quantity and unit price, with the subtotal, tax, and total calculated automatically. Leave pricing off for a clean execution document with no dollar figures.

Do I need a separate work order for each phase or trade?

Usually it reads cleaner that way. One work order per phase, subcontractor, or authorized change keeps the trail readable — the project/phase and change order fields tie each order back to where it belongs, so a GC or inspector can follow a single job instead of untangling three at once. On a large job, run several orders under the same project and number them in sequence.

Explore more free tools

A work order is only as good as the crew
that actually shows up for it.

ShiftFlow connects the jobs you dispatch to the people you schedule, so the right crew is assigned,
clocked in, and accounted for on every work order.

GET THE APP

SIGN UP NOW
WE CAN HELP YOU SAVE

47% less

time spent on administrative tasks

12% saved

on total payroll budget

5+ hours

reclaimed by managers weekly

4.8/5
— based on 10,000+ trusted reviews
START MY 14-DAY FREE TRIAL